Core veneer HS 4408
- C/O (Form E, D, AI, AK, VJ by market)
- Phytosanitary certificate; fumigation on request
- Moisture, thickness and grading report per lot
- FSC documents where the mill is certified

How to buy core veneer, plywood and LVL from TPV Export: terms, documents, container loads and transit times.
We quote to your specification, send samples, check goods before loading and release documents according to the agreed payment terms. These conditions apply to every order.

| Incoterms | FOB Hai Phong, CFR/CIF destination port; DAP on agreed routes |
|---|---|
| Payment | T/T or L/C; details agreed with each quotation |
| Minimum order | One container (20' or 40'HC); mixed specifications allowed within one product line |
| Inspection | Pre-loading check with photos and video for every container; SGS, Bureau Veritas or Vinacontrol at the buyer's request |

Product, thickness, grade, glue, quantity and port.

Price, lead time and loading plan.

Sent by courier on request.

Payment terms as agreed on the quotation.

Every bundle checked for thickness, moisture, bond and face grade before strapping; photos and video of each container.

Clearance, loading on board, original documents released per payment terms.
Standard set for every shipment: contract/PI, commercial invoice, packing list, bill of lading, certificate of origin, export declaration and VGM; insurance for CIF/DAP.
Certificate of Origin, legality documents and fumigation papers are supplied with each shipment. FSC, CARB P2 / EPA TSCA and ISO 9001 apply by product and producing mill; copies on request.
| Product | 20' container | 40' / 40'HC container |
|---|---|---|
| Plywood | About 20 – 24 m³ | About 15 pallets, 44 m³ (27 – 28 t) |
| Core veneer | About 22 – 24 t | About 25 – 26 t |
All shipments leave from Hai Phong port. Transit times are indicative and confirmed with each booking.
| Market | Main products | Tariff preference | Certificate of origin | Transit from Hai Phong |
|---|---|---|---|---|
| UAE (Jebel Ali, Khalifa, Khorfakkan) | Plywood, veneer | Vietnam – UAE CEPA | C/O CEPA | 14 – 25 days (transhipment) |
| Saudi Arabia, Qatar, Kuwait | Plywood | GCC MFN tariff | Non-preferential C/O | 25 – 40 days via Jebel Ali |
| Malaysia, Thailand, Philippines | Plywood, veneer | ATIGA, RCEP | Form D | 5 – 8 days |
| Taiwan | Plywood, veneer | Low MFN tariff | Non-preferential C/O | 3 – 5 days |
| South Korea | Plywood, veneer | VKFTA, AKFTA, RCEP | Form VK, AK | 7 – 10 days |
| Japan | Plywood, veneer | VJEPA, AJCEP, CPTPP, RCEP | Form VJ, AJ | 8 – 12 days |
| China | Veneer | ACFTA, RCEP | Form E | About 3 days to South China |
| India | Veneer | AIFTA | Form AI | 14 – 18 days via Singapore/Colombo |
| Australia | Plywood | AANZFTA, CPTPP, RCEP | Form AANZ | 18 – 25 days |
| United States | Plywood, LVL, veneer | No FTA; MFN tariff | Non-preferential C/O | 25 – 35 days |
| European Union | Plywood, LVL, veneer | EVFTA | EUR.1 | 30 – 40 days |
Yes. Plywood can mix thicknesses.
We provide plantation-origin documents for due-diligence requirements (for example Japan and Australia). FSC applies where the mill holds a certificate, and is stated on the quotation.
T/T or L/C. Deposit and payment timing are agreed in each quotation.
Yes. Plywood bundles can carry your labels.
Hai Phong: Dinh Vu, Lach Huyen or Chua Ve terminals depending on the carrier.
Call or email the person in charge for the fastest quotation.